Closure of Cullever Steps Track from 15th January 2024

The track up from the bridge at Cullever Steps on the Okehampton side of the river will be closed for the relaying of the surface, and possible addition of storage/welfare units. This is estimated to last for 2-4 weeks, depending on the weather. The car park area near the main access road will be used as a layup site for materials and machines so will also need to be closed.